Skip to Main Content
IBM Sterling


This portal is to open public enhancement requests for IBM Sterling products and services. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Add support to controllerWorkflow script to restart BPs that are in "completed, error" state by individual BP IDs
During system issues, we are unable to bulk restart the BP IDs at a time. This is causing huge support effort in the clean-up process. Existing controllerWorkflow.sh script doesn't have a solution to restart the BPIDs that are in "completed, error...
PINNED Present Multiple Host Keys - RSA and ECDSA
As with standard Linux servers today Secure Proxy should be able to present Host Keys (more than one) in both RSA and ECDSA formats depending on what type the vendor incoming connection supports. Vendors are demanding Host Keys that are stronger t...

All ideas

Showing 2627

Node level safety stock values considered when calculating Network level SS

This feature would allow retailers who already define safety stock at node level to more easily leverage the new IBM safety stock rules because the values they set at node level can automatically be considered to create a network level value
almost 2 years ago in Inventory Visibility 0 Future consideration

ERROR - SAP Status Messages reporting incorrect information if one IDOC fails all IDOCs in batch will show failed

IBM SAP Status Messages are reporting inaccurate information. Example, 1000 IDOCs are sent outbound from SAP to IBM in a batch. 3 IDOCS fail with status 04 from IBM. IBM will send back that all 1000 IDOCs have failed with status 04 even though onl...
almost 5 years ago in Sterling B2B Integration SaaS / Mapping & Translation 0 Not under consideration

Selecting Active Directory Group for authentication

Instead of selecting each user from LDAP and give access. If we have option to select the Active Directory Group(low_pre_access_group, high_pre_access_group) from LDAP and assign to access. It will be helpful and reduce task of adding every new us...
almost 1 year ago in Sterling External Authentication Server / Administration & Configuration 3 Needs more information

Update Certificate File via REST API

The B2B REST API allows the user to delete, create, or update attributes (such as the name) of an HTTPS certificate on the system. However, it does not allow a user to update a certificate in place (the "Update from existing PKCS12 Certificate fil...
almost 3 years ago in Sterling B2B Integrator / APIs & SDKs 0 Future consideration

Make ITX functions TimeZone and DST aware

Currently when doing computations with timestamps across DST boundaries the functions (tealted to date/time) don't account for DST switches. This makes the result invalid. So in our case adding or substracting days from a timestamp doesn't take in...
about 1 year ago in Sterling Transformation Extender / Compliance 0 Not under consideration

Enhance SWIFTNet7ClientResend business process to update previously failed filegateway deliveries

Currently SWIFTNet7ClientResend will be triggered via the SWIFT Adapter Scheduler to look at the SWNET_MSG table for failed PUT transfers to SWIFT. Upon detection of these types of failure the scheduler will trigger an execution of the SWIFTNet7Cl...
about 3 years ago in Sterling B2B Integrator / Standards 1 Future consideration

Add EDI FA 997 correlation values to inbound document PIDs (similar to how FA 997 correlation is handled for outbound documents)

When an inbound EDI X12 document is received from a partner an outbound 997 is apparently automatically triggered based on the SCBN setup. This outbound 997 FA shares the same SCBN PID as the originating inbound document, but this action does not ...
about 2 years ago in Sterling B2B Integration SaaS / Inflight 0 Future consideration

Include special characters (e.g. @) in Parameter Name of Obscure Data - Process Data Values service

We are using SI 6.0.3.2 and the Parameter Name does not allow special characters such as "@" being used in the Obscure Data - Process Data Values service. This prevents email addresses being used as Names.
about 3 years ago in Sterling B2B Integrator / Security 1 Future consideration

Addition of RSASSA-PSS signing algorithm to IBM Sterling Integrator B2B

This singing algorithm was requested by a partner that we trade EDI messages with. They provided us with their new AS2 OCES3 certificate, which used RSASSA-PSS as the signing algorithm. What resulted was that we were able to transmit file but we n...
about 1 year ago in Sterling B2B Integrator / B2B Advanced Communications 1 Future consideration

The idea is to change the password encryption algorithm in the dark data service.

file is attached
about 1 year ago in Sterling B2B Integrator / Security 1 Future consideration