Skip to Main Content
IBM Sterling


This portal is to open public enhancement requests for IBM Sterling products and services. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Add support to controllerWorkflow script to restart BPs that are in "completed, error" state by individual BP IDs
During system issues, we are unable to bulk restart the BP IDs at a time. This is causing huge support effort in the clean-up process. Existing controllerWorkflow.sh script doesn't have a solution to restart the BPIDs that are in "completed, error...
PINNED Present Multiple Host Keys - RSA and ECDSA
As with standard Linux servers today Secure Proxy should be able to present Host Keys (more than one) in both RSA and ECDSA formats depending on what type the vendor incoming connection supports. Vendors are demanding Host Keys that are stronger t...

All ideas

Showing 677

Install ALL components either as an User or Administrator

On a windows server things might react differently depending on which user with certain rights installs the software (Designer and Launcher). It shouldn't be a difference or the installer must check on having the proper options. We had some diffic...
about 4 years ago in Sterling Transformation Extender / Installation 2 Delivered

We are planning to upgrade from z/OS 2.3 to 2.4 at the next year. Could you test this solution on your environment?

I was informed by Loan Vo that WDI 3.3.0 was fully tested at z/OS 2.2. We are already at z/OS 2.3, with no issues to WDI. My question is: Could you test this solution on your environment, using z/OS 2.4? Thanks a lot for you attention.
about 4 years ago in Sterling Transformation Extender 0 Delivered

Configurable framework in IV to determine distribution group(s) to be used for inventory lookup functions

Currently, the IV API's expect the requesting application to pass the DG to be used for inventory lookup. In our setup, the determination of DG is configured based on OMS sourcing rules and we have numerous parameters (SKU attributes, shipping sta...
about 4 years ago in Inventory Visibility 1 Delivered

Control Center 6.1 and above - Control Center SLC Debug Report

After Control Center 5.3.04, the SLC Debug Report gets created on the file system of the Control Center application server. I understand that IBM's reason for moving it to the file system was for security reasons, but there has got to be a way tha...
about 4 years ago in Sterling Control Center Monitor 1 Delivered

Node Fill Rate Metrics in the BUC module needs to consider Pick Declines in calculating rate, and should not ignore them

Per feedback regarding Fill Rate calculation Node metrics not considering cancelled/rejected orders - Per the current product design, BUC was not considering cancelled/rejected orders while calculating the node metrics. Our engineering team is rev...
about 4 years ago in OMS - Order Management (OnPrem & OMoC) 1 Delivered

The design of the Pick Declined metric in the BUC should be looking at line status = 1400 even when the line moves to the next status and 1400 is no longer active

Current design of BUC reporting Declined by Node metrics has gap that will under-report and under represent the declines/reject/short-picks by node. -Design as explained in Case #TS004179727 " Pick Decline is a status of BUC and we do not have a s...
about 4 years ago in OMS - Order Management (OnPrem & OMoC) 0 Delivered

Need Oracle AQ adapter to be carried into future releases of ITX. Design Studio, Design Server and Containers.

No description provided
about 4 years ago in Sterling Transformation Extender 3 Delivered

BYO (Bring Your Own) Certificate with CRL checking

For "New Install" tasks - instead of using self-signed certificates, Control Center Director should allow to use user's certificate for the communication between Connect Direct server and Control Center Director.
about 4 years ago in Sterling Control Center Director 2 Delivered

Add Failed Login Attempts information to Audit Log

Failed Login Attempt is considered to be important audit trail information and should be present in the Audit Log.
about 4 years ago in Sterling Control Center Director 2 Delivered

Cerificate expiration monitor setup in websphere

Need to setup certificate expiration monitor in webspehere which can alert us 1 month in advance about expiring certs,can renew/replace certs as needed.
about 4 years ago in Self Service Tool 0 Delivered