Skip to Main Content
IBM Sterling


This portal is to open public enhancement requests for IBM Sterling products and services. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

All ideas

Showing 794

Control Center does not support the Secure connection with the SMTP server

I installed control center and I can't send email to my user reset the password. My relay only uses TLS protocol.
about 3 years ago in Sterling Control Center Monitor / Security 0 Future consideration

Add a feature to pass the failed response from PP to PEM.

Hi, Currently, in PEM under the tab "Wait for Provisioning" when the control passes from PEM to PP to provision the resources in respective environments then in the PEM side we see a triangle draft kind of sign stating that the PP is working to cr...
over 1 year ago in Sterling Partner Engagement Manager / Alerting/Notifications 0 Future consideration

Support/document health endpoints in REST services

It would be useful to have actuator-like health endpoints in the product's REST and REST Authentication WAR services so that a gateway or load-balancer can gracefully work with the services. If these exist, just documenting them would be great.
about 3 years ago in Sterling B2B Integrator / Other 0 Future consideration

prioritizing routing of files, File A routing needs to take precedence over File B. Routing channel template is complex and burdensome. provided by Matt Moder

File ABC and File XYZ both hit their respective mailboxes in SFG at the same time or close to it. Both files use the same routing rule/ template (and associated business processes) File XYZ routing needs to take precedence over File ABC Once File ...
over 1 year ago in Sterling File Gateway / Performance 1 Future consideration

Add support for the "OPTS UTF8 ON" FTP Client command/parameter.

Beginning with Windows Server 2016, the Microsoft FTP Client includes the "OPTS UTF8 ON" command. The Sterling B2B Integrator FTP Server does not support this command, and returns a 501 error message. This "OPTS UTF8 ON" command is included in RFC...
over 1 year ago in Sterling B2B Integrator / Technology Stack Support (OS, DB, Protocols) 1 Future consideration

SSCC Availability in TS Events UI

A user needs to be able to create events for a serial in the transparent supply UI. Currently users are only able to create events for lots in the ui. The serial UI should be similar to the existing UI for lots and would likely be a selection betw...
over 1 year ago in SCIS Transparent Supply Application 0 Future consideration

Support Kerberos authentication for SEAS bind to ADLDAP.

Support Kerberos authentication for SEAS bind to ADLDAP.
about 3 years ago in Sterling External Authentication Server / Security 0 Future consideration

IV doesn't allow syncing negative inventory postion like GIV does.

When an Absolute sync is done for Item-Node combination with -ve value IV ignores it. Where as we have this functionality in GIV
about 3 years ago in Inventory Visibility 3 Future consideration

IV doesn't provide ability to differentiate various shipnodes by ship node type. As a result events published from IV cannot be filtered and/or distributed over separate channels within the external consumer by ship node type.

Currently in Ship Node configuration only Delivery method configuration is there need additional ability to differentiate DC vs Store so we can define various rules based on Ship Node type
about 3 years ago in Inventory Visibility 0 Future consideration

Allow provided service ordered quantity more than defined standard capacity per day

When Provided Services capacity management solution is implemented, one important use case is missed. If our maximum per day servicing capacity is 3 units per store ( resourcepool) and customer wants to order more than 3 units, the expectation is ...
about 3 years ago in OMS - Order Management (OnPrem & OMoC) 0 Future consideration