Skip to Main Content
IBM Sterling


This portal is to open public enhancement requests for IBM Sterling products and services. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Clear

Ideas

Showing 125

Limit MIO Work Queue Data by New Discipline Specific MRP Controllers from SAP

Currently the Work Queue Sets are limited only by Plant, however much of the time spares can be a mix of onshore and offshore locations depending on how close the teams need access to the stock, also due to the set up of maintenance / and the engi...
about 2 months ago in Maximo Inventory Optimization 1 Future consideration

Allow workflow approvers to edit the record and send back to the user.

Our workflow approvers often catch slight tweaks that need to be performed to a record that lands in their inbox, often dealing with MRP settings. (For example, maybe the requestor put an item on planned order instead of automatic replenishment.) ...
2 months ago in Maximo Inventory Optimization 1 Future consideration

Signature parameter to SEASCustomExitInterface class

Hi Team, To perform actual authentication, the client sends a signature generated using the private key. It is a SSH signature verification. To perform signature verification, customer backend generic solution need the following data in the authen...
about 3 years ago in Sterling Secure Proxy / Administration & Configuration 4 Planned for future release

Maximum Logins per user sessions settings configuration in IBM Sterling Secure Proxy Adaptor level

Currently in IBM Sterling Secure Proxy configuration manager at adapter level there is configuration for Maximum Sessions. We are looking for configuration for Maximum Logins" per user.
about 1 year ago in Sterling Secure Proxy / Administration & Configuration 1 Planned for future release

Essentials - add summary graphs for basic reporting

There is no Analytics in Essentials but rudimentary reporting would add some value
3 months ago in Maximo Inventory Optimization 1 Functionality already exists

Allow inventory supervisors the access to stop processing an SLC CR on behalf of the inventory team member that is currently processing the CR, but is out of the office.

It would be useful in the case of an inventory controller being out of the office and a site needs an SLC CR actioned ASAP. It would benefit the flow of production. All inventory supervisors would have access that would enable them to stop process...
over 1 year ago in Maximo Inventory Optimization 1 Future consideration

Automate certificate management

TLS cert life spans are going to become very short by 2029 (https://www.digicert.com/blog/tls-certificate-lifetimes-will-officially-reduce-to-47-days). This effectively means that everyone who uses Sterling file transfer products will have to have...
6 months ago in Sterling Secure Proxy / Administration & Configuration 1 Planned for future release

Compliance Requirement

We have a requirement which needs your help with the possible solutions from the Sterling Secure Proxy application with minimal impact (post deployment). Here is the requirement: There is a portal called Connect portal where partners login with th...
over 2 years ago in Sterling Secure Proxy / Administration & Configuration 1 Planned for future release

Add ability to adjust periods used in calculating issue size

Since we have a great deal of historical data in the tool, I would like to be able to adjust the time period used in calculating the issue quantity, much as I can control how many usage periods are included in the forecast. For one example we look...
3 months ago in Maximo Inventory Optimization 1 Planned for future release

Option to default the optimization method to better service level of "Optimal" and "Fixed Service Level"

For our critical materials, it is imperative that we have stock availability. To ensure this, we use fixed service levels of 98% (for top tier equipment) and 95% for the remainder of material marked critical in SAP. HOWEVER, often times, the Optim...
over 1 year ago in Maximo Inventory Optimization 1 Future consideration