Skip to Main Content
IBM Sterling


This portal is to open public enhancement requests for IBM Sterling products and services. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Add support to controllerWorkflow script to restart BPs that are in "completed, error" state by individual BP IDs
During system issues, we are unable to bulk restart the BP IDs at a time. This is causing huge support effort in the clean-up process. Existing controllerWorkflow.sh script doesn't have a solution to restart the BPIDs that are in "completed, error...
PINNED Present Multiple Host Keys - RSA and ECDSA
As with standard Linux servers today Secure Proxy should be able to present Host Keys (more than one) in both RSA and ECDSA formats depending on what type the vendor incoming connection supports. Vendors are demanding Host Keys that are stronger t...

All ideas

Showing 2910 of 2910

Exclude set periods from the Movement and Forecast Usage calculation due to strike or curtailment

Asset Intensive companies tend to have unionized labor forces that can go "on strike" for a number of months at a time. The usage during these strike periods tends to be considerably curtailed or non-existent. The impact of a 4-6 months-long strik...
almost 2 years ago in Maximo Inventory Optimization 1 Future consideration

Control Center does not support the Secure connection with the SMTP server

I installed control center and I can't send email to my user reset the password. My relay only uses TLS protocol.
almost 4 years ago in Sterling Control Center Monitor / Security 0 Future consideration

Support for MQ version 9.2, currently supports upto v9.1.0.7

Our Implementation uses Global Mailbox and the current version of B2Bi (6.1.0.3, 6.1.1) supports maximum MQ version 9.1.0.7. Our Security and MQ team have identified a security vulnerability with version 9.1.x.x which is remediated with version 9....
almost 4 years ago in Sterling B2B Integrator / Security 0 Is a defect

Implement the use of LDAP without the need of IBM External Authentication Server

In order to implement the use of LDAP for authenticating to Control Center, it is a requirement to use IBM External Authentication Server. There should be a way of doing so without implementing another product that has be installed, configured, an...
almost 6 years ago in Sterling Control Center Monitor / Security 1 Not under consideration

Support/document health endpoints in REST services

It would be useful to have actuator-like health endpoints in the product's REST and REST Authentication WAR services so that a gateway or load-balancer can gracefully work with the services. If these exist, just documenting them would be great.
almost 4 years ago in Sterling B2B Integrator / Other 0 Future consideration

Enhance PGP failure report on Inflight

In case of any PGP encryption or decryption errors, Currently, we are seeing zero byte output in case of PGP issues and failing at subsequent translation steps. But errored report is not indicating about issues in the PGP step. This request is to ...
almost 2 years ago in Sterling B2B Integration SaaS / Alerting/Notifications 0 Future consideration

Compliance check map name visibility issue on Inflight for envelopes with no translation

Below envelope is configured with no map/no translation at ST envelope but still we are getting map name on Inflight, Please correct ELUX_CITIBANKCAN-ED1_004203642_X12_ST_823 Please check screenshots from Inflight and Config Center
almost 2 years ago in Sterling B2B Integration SaaS / Inflight 1 Not under consideration

Enable feature to export only selected entries from the Inflight search results

Currently, Inflight export option exports all search results and there is no option to export only selected entries from search results. Request is to enable feature to export only selected entries from search results.
almost 2 years ago in Sterling B2B Integration SaaS / Inflight 0 Future consideration

EDIFACT versions are not available

We are not able to below EDIFACT versions in Sterling Integrator Map editor. We have downloaded standards from 6.1.2.3 but not coming in map editor. Could you please check and advise. ATHSTS:D:10A SSDCLM:D:10A SSDRSP:D:10A Please refer PMR for ref...
almost 2 years ago in Sterling B2B Integrator / Standards 1 Future consideration

Add details of the shipment in the alert raised for Close Manifest Failure

No description provided
almost 6 years ago in Order Management (OnPrem & OMoC) 0 Future consideration