Skip to Main Content
IBM Sterling


This portal is to open public enhancement requests for IBM Sterling products and services. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Add support to controllerWorkflow script to restart BPs that are in "completed, error" state by individual BP IDs
During system issues, we are unable to bulk restart the BP IDs at a time. This is causing huge support effort in the clean-up process. Existing controllerWorkflow.sh script doesn't have a solution to restart the BPIDs that are in "completed, error...
PINNED Present Multiple Host Keys - RSA and ECDSA
As with standard Linux servers today Secure Proxy should be able to present Host Keys (more than one) in both RSA and ECDSA formats depending on what type the vendor incoming connection supports. Vendors are demanding Host Keys that are stronger t...

All ideas

Showing 2665

Add TrackingID as a variable that can be passed from B2Bi

TrackingID can be optionally enabled in a B2Bi business process. If it is passed to SCC it can be used to good advantage as a correlator in a workflow SLC to track documents as they are handled by a sequence of business processes. This is a reques...
almost 7 years ago in Sterling Control Center Monitor / Usability 0 Future consideration

Cluster statistics utility - queue and thread monitoring

A utility is required that logs queue usage on each node in a Sterling Integrator cluster The utility should track queue usage over time by node and for each node be able to provide statistics (eg. average, min, max, count) for a time period on: Q...
almost 7 years ago in Sterling Control Center Monitor / Reporting 1 Future consideration

Contol Center needs to have a contingency synchronization function

Control Center needs to have a configuration synchronization feature that keeps all of the non-server specific configuration items in sync with a contingency instance of SCC that is not running but shares a synchronized database. Manually copying ...
almost 7 years ago in Sterling Control Center Monitor / Administration & Configuration 0 Future consideration

Identify changes made by upgrade/install

We have made config changes to the SCC config that reside outside of the system. When we upgrade, those changes are sometimes overwritten by the installer. We need a way to know if custom install/config changes are impacted on upgrade.
almost 7 years ago in Sterling Control Center Monitor 0 Not under consideration

Security Admin Role

Create a Security Admin Role that can add/delete id's in all roles and not have access to any other administration permissions such as being able to administer the application, add nodes, etc. This role is for the Security group to manage the priv...
almost 7 years ago in Sterling Control Center Monitor / Administration & Configuration 0 Future consideration

Add Management of Non-Stop C:D Nodes to Control Center

Right now Control Center lacks the ability to be able to manage C:D nodes running on nonstop systems. We would like to utilize Control Center as a centralized management system for C:D running on all platforms.
almost 7 years ago in Sterling Control Center Director 0 Not under consideration

Control Center 6.1 - Eliminate "This user is already logged into IBM Control Center web console" Message

Currently if a user is already logged onto the Web console and logs in again, they receive the message "This user is already logged into IBM Control Center web console". We would like to have a way of either turning this message off or customize t...
almost 7 years ago in Sterling Control Center Monitor / Administration & Configuration 0 Future consideration

Rotables Logic Widget

A Functionality around Split Valuation materials to allow for overall right-sizing Core, Repaired, New, Capital materials from SOH and ROP/MAX = How many of each type is needed, how many are "in rotation" where are they, how many are due back eith...
over 1 year ago in MRO Inventory Optimization 6 Future consideration

Add red asterisks in front of required fields (same as tables already does)

This is already a feature within tables... it should be everywhere else to match.
almost 7 years ago in Sterling Partner Engagement Manager 0 Planned for future release

E-mail Template Variables Standardized

The numbers used to identify variables within e-mail templates should be consistent across all templates.
almost 7 years ago in Sterling Partner Engagement Manager / Usability 1 Not under consideration