Skip to Main Content
IBM Sterling


This portal is to open public enhancement requests for IBM Sterling products and services. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Present Multiple Host Keys - RSA and ECDSA
As with standard Linux servers today Secure Proxy should be able to present Host Keys (more than one) in both RSA and ECDSA formats depending on what type the vendor incoming connection supports. Vendors are demanding Host Keys that are stronger t...
PINNED Add support to controllerWorkflow script to restart BPs that are in "completed, error" state by individual BP IDs
During system issues, we are unable to bulk restart the BP IDs at a time. This is causing huge support effort in the clean-up process. Existing controllerWorkflow.sh script doesn't have a solution to restart the BPIDs that are in "completed, error...

All ideas

Showing 793

Cleanup prior version .jar files

The install/upgrade/patch/hotfix process should cleanup the prior version .jar files. We have been running since 2016 and every .jar file from upgrades are in the <install>/packages folders as well as other folders having years worth of back...
almost 2 years ago in Sterling B2B Integrator / Installation & Upgrade 1 Future consideration

retrieve the entitlement_mode for payloads and events records

When using the Trace API - Get Payload or Events - I do not get the information for attribute "entitlement_mode". This could be helpfull to check what entitlement mode is currently applied. This already works for Products, Locations.
7 months ago in SCIS Transparent Supply Application 0 Future consideration

Ensure failover detection ping from SSP PS can be recognized as such in B2B

These pings are causing literally thousands of errors in our C:D logs on B2B every hour - as the C:D server adapter can see the pings hitting the port but recognizes that they are not valid C:D sessions. A recent health check performed by IBM/Sabr...
almost 3 years ago in Sterling B2B Integrator / Performance 1 Future consideration

"auto-refresh" browser functionality on myFileGateway 2.0

Recently, we observed that when downloading a file through myFileGateway, the file is still displayed by the browser and we must refresh the page to don't see the file anymore in the folder, The case TS006115503 inform us that SI doesn't have this...
about 3 years ago in Sterling B2B Integrator / Usability 0 Future consideration

Add Certificate Authentication capability to the CD Web Services REST API web interface (swagger).

CD Web Services supports certificate authentication for the web UI and also for REST API calls, but the provided web UI interface for testing REST API (swagger, path is cdws-doc/signOn.html) does not. This makes it difficult to design and test sol...
4 months ago in Sterling Connect:Direct / Usability 2 Future consideration

Hold based rescheduling to update ETD/ETS for scheduled order lines

There is a need for an automated rescheduling feature in OM. Especially on B2B, the requested ship date tends to be important and may often change for order line via integration. In these cases the order line should be rescheduled automatically. C...
almost 2 years ago in OMS - Order Management (OnPrem & OMoC) 0 Future consideration

Adding Email Body via BPN ST tool

There are lot of request in Electrolux project for email flows where we need to deliver the output file as attachment in email and also send email body with some message to the trading partners. Currently, we use ITX map and Attachment Macro to ac...
over 2 years ago in Sterling B2B Integration SaaS / Other 0 Future consideration

Ability to View Message, Put Message, and View Oldest Message in Queues for Prod and Preprod Envs

In QA and DEV under Queue configuration > Queue Processes we have options for -Put message -view message -view oldest message -delete queue -clear queue In Preprod and Prod we only have options for -delete queue - clear queue We cannot troubles...
11 months ago in Self Service Tool 0 Future consideration

Allow for Connect Direct service account to be non-interactive

For Windows servers we need the Connect Direct service account to be non-interactive (Per Windows functionality, the service account needs to perform a logging event to retrieve the properties (access/grants/rights) that the user has. For financia...
over 3 years ago in Sterling Connect:Direct / Usability 2 Future consideration

Automation of certificate replacement in SSP and SI

As we are replacing SSL certificates more often and validity lengths are shortening we will have to do more certification replacements. I would like a way to automate the certificate replacement within SI and SSP. I would need an automated or scri...
7 months ago in Sterling Secure Proxy / Security 1 Future consideration