Skip to Main Content
IBM Sterling


This portal is to open public enhancement requests for IBM Sterling products and services. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Add support to controllerWorkflow script to restart BPs that are in "completed, error" state by individual BP IDs
During system issues, we are unable to bulk restart the BP IDs at a time. This is causing huge support effort in the clean-up process. Existing controllerWorkflow.sh script doesn't have a solution to restart the BPIDs that are in "completed, error...
PINNED Present Multiple Host Keys - RSA and ECDSA
As with standard Linux servers today Secure Proxy should be able to present Host Keys (more than one) in both RSA and ECDSA formats depending on what type the vendor incoming connection supports. Vendors are demanding Host Keys that are stronger t...

All ideas

Showing 2598

Create Business view in Config Center for Codelists, Mappings, Connections, Keys/Certficates

This feature will be helpful when there are codelists with same names across different BA's. Same map names such as document extraction maps or typing maps across different BA's. Could be helpful for connections and keys/certificates
2 months ago in Sterling B2B Integration SaaS / Other 4 Needs more information

Specify our desired default settings for Preferred Cipher and Preferred MAC Algorithm

When creating a new SSH Remote Profile, the Preferred Cipher and Preferred MAC fields are defaulting to values that are deprecated (blowfish-cbc and hmac-sha1). I was told that those deprecated settings are hardcoded in the B2Bi application. We wi...
6 months ago in Sterling B2B Integrator / Security 1 Future consideration

DCB Information is missing in the parameters passed through the Process Data for CDSA Runtask

We have a requirement for additional parameters to be passed to the B2B Integrator CDSA through the Runtask exit to the Runtask Business Process script. Previously, parameters have been added to the data passed from the inbound Connect:Direct sess...
3 months ago in Sterling B2B Integrator / Administration & Configuration 4 Not under consideration

Users should have the ability to produce an alert whenever Control Center loses connection to it's own database

Of course, whenever it loses connection to the DB it will not be able to write anything to the EVENTS table but when that connection is re-established, there should be some message written that indicates there's been a problem that we can monitor ...
5 months ago in Sterling Control Center Monitor / Other 1 Needs more information

B2B System Logs UI - Logging Level Should Exist on All Logs

Currently, if you are in B2B -> System Logs UI and attempt to edit Log Settings for a log, you are offered two different scenarios: Scenario 1 - You are provided the Roll Over Interval drop-down and a Logging Level of "on" or "off". Scenario 2 ...
about 2 months ago in Sterling B2B Integrator / Reporting 0 Submitted

ICAP scanning required for files pulled and pushed by Sterling Integrator

Files that are pushed by external vendors are scanned via ICAP protocol in Sterling Secure Proxy. But the files that are pulled by Sterling Integrator are not scanned as they do not pass through SSP. This leaves a big gap in the scanning feature o...
8 months ago in Sterling Secure Proxy / Security 2 Planned for future release

generate a PDF file with the images and tables using the details in the received input file.

PDF adapter needs more power to generate pdf files with images and tables using the data from the input file/message.
3 months ago in Sterling Transformation Extender / Design Studio 0 Under review

CDWindows Support for Microsoft Windows Server 2025

Official CDWindows product support for the Microsoft Windows 2025 OS , for future/standard lifecycle management purposes and continued OS supportability.
28 days ago in Sterling Connect:Direct / Usability 2 Future consideration

Issues with Sterling VAN with AS2 connection, not able to transmit VDA files

Issues with Sterling VAN with AS2 connection, not able to transmit VDA files to Daimler customer via T system because there is an issue with T-system due to missing header information. This has been showstopper for our VAN migration project and le...
28 days ago in Sterling B2B Integration SaaS 0 Submitted

Allow inventory supervisors the access to stop processing an SLC CR on behalf of the inventory team member that is currently processing the CR, but is out of the office.

It would be useful in the case of an inventory controller being out of the office and a site needs an SLC CR actioned ASAP. It would benefit the flow of production. All inventory supervisors would have access that would enable them to stop process...
6 months ago in MRO Inventory Optimization 1 Future consideration