Skip to Main Content
IBM Sterling


This portal is to open public enhancement requests for IBM Sterling products and services. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Clear

Ideas

Showing 109 of 2953

Allow inventory supervisors the access to stop processing an SLC CR on behalf of the inventory team member that is currently processing the CR, but is out of the office.

It would be useful in the case of an inventory controller being out of the office and a site needs an SLC CR actioned ASAP. It would benefit the flow of production. All inventory supervisors would have access that would enable them to stop process...
over 1 year ago in Maximo Inventory Optimization 1 Future consideration

Add ability to adjust periods used in calculating issue size

Since we have a great deal of historical data in the tool, I would like to be able to adjust the time period used in calculating the issue quantity, much as I can control how many usage periods are included in the forecast. For one example we look...
3 months ago in Maximo Inventory Optimization 1 Planned for future release

Option to default the optimization method to better service level of "Optimal" and "Fixed Service Level"

For our critical materials, it is imperative that we have stock availability. To ensure this, we use fixed service levels of 98% (for top tier equipment) and 95% for the remainder of material marked critical in SAP. HOWEVER, often times, the Optim...
over 1 year ago in Maximo Inventory Optimization 1 Future consideration

Please add export functionality to References screen

Be able to export CSV/XLX files out of the references screen
4 months ago in Maximo Inventory Optimization 3

Add 'source' information in deleted item file to keep from unintentionally deleting records from different ERP instances.

We had an issue in which items were unintentionally deleted from the tool. This was because: 1) we have multiple SAP boxes loaded into one MIO instance. 2) an item from one of the SAP boxes was deleted in SAP at the client level 3) an item with th...
4 months ago in Maximo Inventory Optimization 3 Planned for future release

Expand the Smart Review code so it works for Dow data

The Smart Review feature does not work for Dow. We believe that this feature would increase the efficiency of work queue recommendation reviews, which are all manual by a Reliability Engineer and Inventory Coordinator.
4 months ago in Maximo Inventory Optimization 1 Planned for future release

Introduce new field Count of Work Queues into Bulk list view

Recommending the introduction of new field for Bulk list view (Items) to allow a user to see if the item is currently on a Work Queue. This could be shown as a count or perhaps a Yes. Additionally, the ability to see which work queues. This would ...
8 months ago in Maximo Inventory Optimization 1 Future consideration

Add a "reject" button in addition to approve and defer.

The current practice of our users, if they do not want to accept the tool's recommended parameters, is to make a note, select "approve" but leave the export button unchecked. It can be difficult to determine whether or not the tool's recommendatio...
over 1 year ago in Maximo Inventory Optimization 1 Future consideration

Update db_optimization_tool.sh to support Oracle and other DB Vendors

In the past IBM provided the db_optimization_tool.sh script with B2B Integrator to facilitate index reorgs with MySQL DBs. Several companies such as my own will only implement vendor scripts for index reorgs. Can IBM update that script and supply it.
over 4 years ago in Sterling B2B Integrator / Performance 1 Not under consideration

Ensure failover detection ping from SSP PS can be recognized as such in B2B

These pings are causing literally thousands of errors in our C:D logs on B2B every hour - as the C:D server adapter can see the pings hitting the port but recognizes that they are not valid C:D sessions. A recent health check performed by IBM/Sabr...
almost 4 years ago in Sterling B2B Integrator / Performance 1 Future consideration