Skip to Main Content
IBM Sterling


This portal is to open public enhancement requests for IBM Sterling products and services. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

FILTER BY CATEGORY

Control Center

Showing 253

Sterling Control Center does not show the process number of a Sterling Integrator business process

Sterling Control Center does not display the Connect:Direct process numbers from a Sterling Integrator business process going through the CDSA. This is because the process number is actually not passed from Sterling Integrator to Control Center. T...
over 4 years ago in Control Center / Reporting 0 Future consideration

Need an ICC report that returns counts of file transfers and total byte counts for a given interval.

I need a report where 1. I can specify a date interval for the report.2. The report should give me an option for detail or summary.3. The detail would give me a list with 4 columns showing the date, the producer partner name, #of files failed or r...
over 4 years ago in Control Center / Reporting 0 Functionality already exists

Operating System version to be collected by ICC and displayed.

Currently Control Center shows the Operating system as UNIX, Windows etc. It would be more beneficial if Control Center could display the actual OS version , eg Windows 2012, RedHat 6.8.
over 3 years ago in Control Center / Administration & Configuration 1 Future consideration

Single Sign On for IBM Control Center using IBM Sterling Secure Proxy

Implementation of Single Sign On for IBM Control Center using IBM Sterling Secure Proxy, similar to myfilegateway for Sterling File Gateway for external trading partners : In a IBM Sterling B2B Integrator Global Implementation, for a external t...
about 1 year ago in Control Center / Usability 0 Planned for future release

Automation for running the configCC in SCC

As of now we cant run configCC.sh/bat script, we have to enter the host details manually. Even we cant use silent file to provide these information.
over 4 years ago in Control Center / Administration & Configuration 2 Future consideration

Report to pull last accessed/last login time for all partners

There seems to be a lack of reporting on historical activity of users/partners in Sterling to be able to determine if an account is active and when it was last active. I'm currently trying to pull a last login/last accessed timestamp for each user...
over 4 years ago in Control Center / Reporting 0 Future consideration

LDAP integration with Sterling Control Center

Sterling Control Center should be able to interface directly with LDAP to authenticate without the addition of Sterling External Authentication Server.
over 4 years ago in Control Center / Security 3 Not under consideration

Ability to pass custom alerts to SCC from B2Bi

This is for the ability to send custom alerts to SCC from B2Bi/SFG systems. A service should be designed for use in business processes to allow information to be passed into SCC.
over 4 years ago in Control Center / Usability 0 Not under consideration

FileGatewayDeliverFTP business process failure not generating alerts in Sterling Control Center

->FileGatewayDeliverFTP business process failure not generating alerts in Sterling Control Center Comments from IBM: Control Center does not monitor system level BPs, and that is by design. The customer can open an enhancement if they desire an...
over 4 years ago in Control Center / Other 0 Future consideration

Display SNode User ID (SNODEID) value in log fetched via SCC or CD API

Information about used SNODEID (SNode User ID) option is present in log displayed in CD Requested and "direct.exe" CLI but it is not displayed in SCC or via CD API (JAI). Please extend SCC and CD API to display SNODEID option usage.
over 4 years ago in Control Center 0 Future consideration