Skip to Main Content
IBM Sterling


This portal is to open public enhancement requests for IBM Sterling products and services. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Installation & Upgrade

Showing 17

IBM Sterling B2B Integrator External Perimeter Server Version details.

Logging the version details of IBM Sterling B2B External Perimeter Server either files like "PSLogger" or "StartupPS.log" or "remote_perimeter.properties" files of IBM external perimeter server. This would be more helpful during below scenario'...
over 2 years ago in Sterling B2B Integrator / Installation & Upgrade 0 Future consideration

GnuPG latest version (2.2.x) integration with B2Bi 6.x

After upgrade of B2Bi from 5.2.6.x to 6.1.1.0, we are no longer able to use GnuPG. 6.1.1.0 has supported OS for RHEL 7/8. Newer RHEL versions have latest GnuPG installed on it as base package configuration where we are getting (2.2.x) version. B2B...
almost 3 years ago in Sterling B2B Integrator / Installation & Upgrade 1 Not under consideration

Portable installation for B2B (non container)

In our environment we do not use container for B2B, but we have an automated installation process using IBM Installation Manager, however this process is slow and difficult to generate all the steps to make it autonomous. We would like the B2B ins...
over 1 year ago in Sterling B2B Integrator / Installation & Upgrade 1 Not under consideration

Cleanup prior version .jar files

The install/upgrade/patch/hotfix process should cleanup the prior version .jar files. We have been running since 2016 and every .jar file from upgrades are in the <install>/packages folders as well as other folders having years worth of back...
about 2 years ago in Sterling B2B Integrator / Installation & Upgrade 1 Future consideration

GPM (Graphical Process Modeler)

The current version of GPM does not function with the current Java SDK levels. The last valid Java JDK is Java 1.8.0_281. This fails to meet current Java versions for vulnerability issues. As a result, many will have to justify the need to run an ...
almost 2 years ago in Sterling B2B Integrator / Installation & Upgrade 8 Functionality already exists

Installation Manager Documentation

IM should be simple to install and easy to use. Since the UI cannot be used for the install there needs to be explicit instructions on how to Install/Upgrade Sterling Integrator, including sizing and recommended location, considering the old way w...
over 5 years ago in Sterling B2B Integrator / Installation & Upgrade 0 Is a defect

HSTS enhancement on GIS system

u As per the incident TS007584566 we have requested for HSTS enhancement in GIS system. Previously we have requested the same via TS007322240 and we have been suggested to raise a enhancement request as it is standard functionality. Kindly conside...
about 3 years ago in Sterling B2B Integrator / Installation & Upgrade 3 Not under consideration

Upgrade/Fix Installation should log and recreate the custom Database Indexes dropped during the installation

As per the current design , Fix installation drops all the Custom Indexes created on Database and recreates the Database schema without the custom indexes dropped. Customers will be having lot many custom changes (Custom Indexes) done on Databa...
over 5 years ago in Sterling B2B Integrator / Installation & Upgrade 1 Planned for future release

IBM Sterling B2B Integrator Certified Container - db-setup pod should have logs volumes attached

db-setup pod should have logs volumes attached so the logs can be retained even after the auto deletion of db-setup pod. IBM asks for the logs but because the db-setup pod auto deleted so even the ephemeral logs also get deleted which are very imp...
almost 2 years ago in Sterling B2B Integrator / Installation & Upgrade 3 Functionality already exists

remove hard coded SMTP information from standard BP

In current business environments most connections to SMTP servers don't use plain SMTP port 25 any more but use secure ports like 465 or 587. With current hard coded value 25 for SMTP port many of the standard BPs can't send emails even if the cor...
over 2 years ago in Sterling B2B Integrator / Installation & Upgrade 1 Not under consideration